The main park includes a ability of two hundred MW whilst Sandrini II provides a capacity of 100 MW. The entire cost of both equally jobs weren't disclosed nevertheless, for the duration of development, over two hundred staff ended up employed. The jobs are envisioned to view A few positions https://vacavillesolarcompanies.blogspot.com/2024/07/what-services-you-can-have-from-top.html